Merchandise Description

 

Complex information checklist: 

Kind: Worm Equipment CZPT Reducer
Model: NMRV571–a hundred and fifty
Ratio: one:7.5,10,fifteen,twenty,25,30,40,50,60,80,one hundred
Coloration: Blue/Silver Or On CZPT er Request
Substance Housing: Blue-Coloured Cast-Iron
Worm Gear-Copper-10-3#
Worm-20CrMn Ti with carburizing and quenching, surface area harness is 56-62HRC
Shaft-chromium steel-45#
Lubricant: Synthetic&Mineral
Bearing: C&U CZPT
Seal: NAK CZPT
Warranty: -thirty-40°C
ICE FLANGE 80B5,90B5,100B5,112B5,132B5,160B5 
Rated CZPT : .06KW,.12KW,.25KW,.75KW,1.5KW,3KW,5.5KW,7.5KW
Application Metallurgical machinery, foods machinery, phase equipment,
welding machinery, road equipment, amusement equipment,
packaging machinery, CZPT and plastic machinery,
environmental safety equipment ,engineering machinery,
design equipment, device tool business,
 automotive sector, logistics and transportation and so on

 
 

NMRV PAM N M P D
  ICE       five 7.5 ten fifteen twenty twenty five 30 40 fifty 60 eighty one hundred
twenty five 56B14 fifty sixty five eighty 9 nine 9 9 9   nine nine nine 9    
30 63B5 ninety five one hundred fifteen a hundred and forty eleven eleven eleven 11 eleven eleven 11 11 11      
63B14 sixty seventy five ninety                        
56B5 eighty 100 120 nine nine nine nine nine nine nine nine 9 nine 9  
56B14 50 sixty five eighty                        
40 71B5 110 a hundred thirty one hundred sixty 14 14 14 fourteen fourteen 14 14 fourteen        
71B14 70 85 one hundred and five                        
63B5 95 one hundred fifteen one hundred forty 11 11 eleven 11 11 eleven eleven eleven eleven 11 11 eleven
63B14 60 seventy five ninety                        
56B5 80 one hundred 120                 9 nine 9 9
50 80B5 one hundred thirty a hundred sixty five 200 19 19 19 19 19 19 19          
80B14 80 one hundred 120                        
71B5 a hundred and ten one hundred thirty one hundred sixty 14 14 14 fourteen 14 fourteen 14 14 fourteen fourteen 14  
71B14 70 85 one zero five                        
63B5 ninety five a hundred and fifteen a hundred and forty               11 eleven 11 eleven 11
63 90B5 a hundred thirty one hundred sixty five two hundred   24 24 24 24 24 24          
90B14 95 one hundred fifteen 140                        
80B5 one hundred thirty 165 200   19 19 19 19 19 19 19 19 19    
80B14 eighty 100 one hundred twenty                        
71B5 110 one hundred thirty one hundred sixty               fourteen 14 14 14  14
71B14 70 eighty five one hundred and five                        
75 a hundred/112B5 a hundred and eighty 215 250   28 28 28                
100/112B14 one hundred ten 130 one hundred fifty                        
90B5 a hundred thirty one hundred sixty five two hundred   24 24 24 24 24 24 24        
90B14 95 a hundred and fifteen one hundred forty                        
80B5 a hundred thirty 165 200         19 19 19 19 19 19 19 19
80B14 80 a hundred 120                        
71B5 110 130 one hundred sixty                 14 fourteen 14 fourteen
90 100/112B5 190 215 250   28 28 28 28 28 28          
100/112B14 one hundred ten 130 a hundred and sixty                        
90B5 130 one hundred sixty five two hundred   24 24 24 24 24 24 24 24 24    
90B14 ninety five a hundred and fifteen a hundred and forty                        
80B5 130 165 200               19 19 19 19 19
80B14 eighty a hundred 120                        
110 132B5 230 265 three hundred   38 38 38 38              
a hundred/112B5 a hundred and eighty 215 250   28 28 28 28 28 28 28 28 28    
90B5 one hundred thirty 165 two hundred           24 24 24 24 24 24 24
80B5 a hundred thirty a hundred sixty five 200                     19 19
130 132B5 230 265 three hundred   38 38 38 38 38 38 38        
a hundred/112B5 180 215 250           28 28 28 28 28 28 28
90B5 one hundred thirty one hundred sixty five two hundred                     24 24
150 160B5 250 300 350   42 42 42 42 42            
132B5 230 265 250         38 38 38 38 38 38    
one hundred/112B5 180 215 200                 28 28 28 28

      

 

Components:

one. Housing: Die-forged CZPT Alloy Gearbox (RV571~RV090)
Solid Iron Gearbox (RV110~RV150)
2. Worm Wheel: CZPT rable Tin Bronze Alloy, CZPT Bronze Alloy
3. Worm Shaft: 20Cr Metal, carburizing, quenching, grinding, floor hardness fifty six-62HRC, .3-.5mm remaining carburized layer soon after specific grinding
four. Input Configurations:
Geared up with CZPT ctric CZPT s (AC CZPT , Brake CZPT , DC CZPT , Servo CZPT )
IEC-normalized CZPT Flange
Sound Shaft Input
Worm Shaft Tail Extension Input

five. Output Configurations: Keyed Hollow Shaft Output
Hollow Shaft with Output Flange
Plug-in Strong Shaft Output
six. CZPT Areas: Worm Shaft Tail Extension, Solitary Output Shaft, Double Output Shaft, Output Flange, Torque Arm, Dust Cover
seven. Gearbox Portray:
Aluminum Alloy Gearbox:
Soon after Shot Blasting, Anticorrosion Treatment and Phosphating, Paint with the Colour of RAL 5571 Gentian Blue or RAL 7035 CZPT Grey
Forged Iron Gearbox:
Following Painting with Red Antirust Paint, Paint with the Shade of RAL 5571 Gentian Blue

Workshop show

  

FAQ

Q1. What is your terms of packing?
A: Generally, we pack CZPT merchandise in one coloration box. If you have specific ask for about packing, pls negotiate with us in CZPT , we can pack the items as your ask for.

Q2. What is your conditions of payment?
A: T/T 30% as deposit, and 70% before supply. We will demonstrate you the pictures of the items and packages 
ahead of you shell out the equilibrium. CZPT payments terms, pls negotiate with us in CZPT , we can go over.

Q3. What is your terms of shipping and delivery?
A: EXW, FOB, CFR, CIF.

This fall. How about your shipping and delivery time?
A: Generally, it will just take 25 to thirty times soon after receiving your CZPT payment. The specific supply time depends 
on the objects and the quantity of your get.

Q5. Can you make in accordance to the samples?
A: Yes, we can produce by your samples or complex drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can provide the sample if we have prepared elements in stock, but the CZPT ers have to pay the sample cost and 
the courier value.We welcome sample get.

Q7. Do you examination all your items prior to supply?
A: Sure, we have one hundred% take a look at prior to delivery

Q8: How do you make CZPT business CZPT -term and great partnership?
1. We hold great top quality and competitive value to make sure CZPT CZPT ers benefit
two. We respect each CZPT er as CZPT friend and we sincerely do business and make pals with them, 
no issue where they arrive from.

Equipment reducers, also called reducers, come in many transmission styles and are made to multiply torque and lessen input speed to a sought after output velocity. The primary advantage of inline gearboxes is their potential to keep control in apps involving large rotational speeds. Their efficiency and capacity to offer higher input speeds with small backlash make inline reducer gearboxes perfect for a extensive range of motion management programs
china  near me Aluminum Alloy Housing RV Series Worm Gearbox manufacturers